top of page

The following are basic reference prices for common maintenance items. The final quote will be adjusted according to the actual situation (such as materials, complexity, and region).

1

Bathroom Project

New installation and replacement of shower screen casters, including labor and materials from ordinary brands... $400-800

New installation and replacement of washbasin faucets, including labor and materials (standard brand)... $1000-1200

New bathtub faucet installation and replacement, including labor and materials (standard brand)... $1000-1200

New installation and replacement of the main water faucet (including labor and materials, standard brand)...................... $800-1000

Washbasin with air seal, drain, and leak repair - disassembly, replacement, labor, and materials included... $1000-1200

Bathtub/washbasin blockage: drain line manually... (depending on the situation)

Cylinder floor modification and installation, including labor and materials... On-site quotation.

New bathroom screen installation and replacement including labor and materials... $4500-5000

Mirror cabinet $800 < New installation/replacement including labor and materials...................... $800-1200

Aluminum ceiling renovation and replacement including labor and materials...................... $80-100/sq ft

2

Toilet project

Toilet seat $2000 < Disassembly and replacement including labor and materials $3200-3500

Toilet water supply unit removal, installation, and replacement including labor and materials... $600-800

Toilet flush pump disassembly, installation, and replacement including labor and materials... $1000-1200

Washbasin with air seal, drain, and leak repair - disassembly, replacement, labor, and materials included... $1000-1200

Washbasin disassembly and replacement, including labor and materials... $2000-3000

The sink is clogged; drain the water manually... (depending on the situation)

3

Power Engineering

Electric switch/plug-in position hose extension cord and labor/materials...................... $800-1200/position

Switch/plug replacement, including labor and materials...................... $500-800/plug

The ceiling lamp does not need to be installed or packaged.............$200-300

Fan ceiling light does not need to be installed or packaged.............$300-500

Trip switch inspection...................... On-site quote

FIX (Flying Steel) disassembly and replacement...................... On-site quote

4

Kitchen Project

Aluminum ceiling renovation and replacement including labor and materials...................... $80-100/sq ft

Disassembly and replacement of zinc washing tray for vegetables, including labor and materials... $2500-3500

Wardrobe/wall cabinet door removal, installation, and replacement including labor and materials...................... $400-600/piece

Wardrobe/cabinet door replacement (including labor and materials) costs $100-150 per pair.

Zinc pan blockage, water level artificially unclogged...................... depending on the situation

5

Aluminum windows/aluminum doors

Aluminum windows, including labor and materials, cost $300-400 per window compared to disassembly and replacement...

Aluminum window handle removal, installation, and replacement including labor and materials...................... $200-400/piece

Aluminum-glass sliding door rollers (copper) replacement, including labor and materials: $800/pair

Aluminum glass sliding door rollers (plastic) disassembly, installation, and replacement including labor and materials...................... $400/pair

Aluminum glass sliding door lock removal, installation, and replacement including labor and materials... $300-600

Glass aluminum window/aluminum door disassembly, installation, and replacement including labor and materials...................... depends on quality

6

Terrace Project

Adding copper hoses/faucets...................... Measurement quote

7

Rooftop Project

Adding copper hoses/replacing washing machine faucets, including labor and materials...................... Measurement and quotation

Light bulb/wave-wave light removal, installation, and replacement, including labor and materials...................... $600/each

8

Locks

Door lock removal, installation, and replacement, including labor and materials (standard brand)...................... $400/each

Door lock (hole opening) removal, installation, and replacement, including labor and materials (standard brand)...................... $800-1000

Door lock (no drilling required) removal, installation, and replacement, including labor and materials (standard brand)... $600-800

9

Gate Project

Door (excluding lock) disassembly, installation, replacement, and custom-made labor and materials ...................... $4000-5000

Door (lock not included) disassembly, installation, and replacement including labor and materials, in stock ...................... $2000-2500

10

Garden Project

New construction/replacement of fences ...................... Measurement quote

New flooring installation/replacement ... Measurement quote

Adding copper hoses/faucets, new installations or replacements including labor and materials ... Measurement and pricing

Light bulb/wave-wave light removal, installation, and replacement, including labor and materials ...................... $600/each

PC plastic eaves, new installation, including labor and materials, up to 2 meters ... $1500/each

Aluminum gate disassembly, installation, and replacement ...................... depending on quality

11

Painting Project

Full house repainting...................... Measurement quote

12

Waterproof and leakproof

Rooftop/Bathroom Waterproofing and Leak Prevention...................... On-site Quotation

13

Waste disposal

Construction waste disposal......................On-site quote

Friendly reminder:

  • Unless otherwise specified, the prices above are net labor costs and do not include material costs.

  • After receiving your information, we will provide a formal quotation, and construction will only begin after you have given your approval.

  • Feel free to contact us anytime for a preliminary quote!

bottom of page